3rd TIF Project

The design for the first phase (3A) of the next TIF Project is complete and has moved into the construction phase. Construction on phase 3A is anticipated to begin March 2019 and conclude September 2019. The project consists of constructing roadway, sidewalk, lighting, and storm sewer improvements along Beverly Avenue and the Alleyway behind Beverly, as well as improvements to 4th Street between Beverly Avenue and the Alleyway. Improvements also include soldier pile lagging wall, landscaping, and dumpster pads with enclosures.

A subsequent phase (3B) is still in the design phase; that phase will include upgrades to the intersection between Beverly Avenue and 6th Street.

Estimated Total Project Cost: $4.5-5 million (Construction for Phase 3A, $2.2 million)
Contractor: Green River Group (Phase 3A)
Engineer: Herbert, Rowland & Grubic, Inc.